Where are you calling from? ivermectina para humanos uruguay On a weekday afternoon in August, the only sign ofconstruction work at the still-unfinished Mszana bridge was alone man in a high-visibility jacket pacing around, and aforklift truck that delivered a water tank. The motorway betweenPoland and the Czech Republic is blocked at the bridge, forcingvehicles to make a detour, squeezing through narrow countryroads. ($1 = 0.7312 euros) (Additional reporting by Jose Elias Rodriguez in Madrid,Georgina Prodhan in Vienna, Jack Watling in London and AdrianKrajewski in Warsaw; Edited by Simon Robinson and Sara Ledwith)
|